Prepping the Plant

The brewery definitely has a buzz about it everyday now.  It seems that there’s always something else being completed and a new task immediately takes it’s place.  So far, we’ve finished off the offices and conference (or chill) room, stripped the floor of the tasting room, and had our trench drains installed in the brewery.  Hopefully we’ll have concrete poured and maybe some new viewing windows in this week.  Can’t wait to have our grand opening and share our dream with everyone.  Meanwhile our equipment is scheduled to arrive within a couple weeks and we’re scrambling to make sure everything is ready.